GreyMatter Foundry
Prove it. Then build it.
Simulate your warehouse before you commit capital — from first logic to runtime emulation.
95%+
Accuracy predicting performance and costs
Source: Press release — GreyMatter Foundry (Apr 13, 2026) (opens in a new tab)Digital twin
Design it. Simulate it. Prove it. Then build it.
01Logic Design
02Capacity Validation
03Technology Sizing
04Spatial Simulation
05Runtime Emulation
Scenario · Peak week
SIM 00:42:17
- Throughput
- 715lines/hr
- Utilization
- 92%
- Station queue
- 16totes
- Congestion
- 8%
Visual demonstration using an illustrative model — not an engineering simulation. Note how adding robots eventually adds congestion instead of throughput.
Five stages
From logic to runtime.
01
Logic Design
Define flows, rules and order profiles.
02
Capacity Validation
Check the design can meet peak demand.
03
Technology Sizing
Choose robot counts, stations and storage.
04
Spatial Simulation (DES)
Run discrete-event simulation on the real layout.
05
Runtime Emulation
Exercise the production software before go-live.